To meet increased electricity demand and growth, SRP built a 20-mile, double-circuit, 230-kilovolt (kV) transmission line connecting two SRP-owned and previously sited 230/69kV substation sites. The new transmission line will also connect to a new 230/69kV substation named Pfister that was sited as part of this project.